konkrit di kawasan slab belakang
konkrit d kawasan pentas
konkrit tie beam dn 1 biji pilecap yg tertinggal
Anas berjaya mengesan pilecap yg terdapat honeycomb.
kerja2 bata diteruskan di tingkat 1
kerja2 pemasangan frame tingkap di tingkat bawah
arrival of window frames 4 main block
kerja2 kayu bersebelahan bgn main block sblh tnb yg telah siap di konkrit
kerja2 pemasangan roof truss di roof beam kantin.
kerja2 pemasangan besi tetulang grd. beam bersebelahan slab yg dikonkrit.
Wednesday, June 30, 2010
Tuesday, June 29, 2010
28062010
empat biji pilecap dikonkrit.
1 biji pilecap tidak dpt dikonkrit.
kerja-kerja batu diteruskan
kerja-kerja kayu di bahagian belakang.
pemasangan besi tetulang beam di bahagian belakang.
pengorekan kerja-kerja sanitari plumbing.
kerja-kerja pemasangan kekuda bumbung kantin.
penghantaran 1000 lbh guni gypsum.
29062010
kerja2 batu diteruskan.
pemasangan besi tetulang ground beam di bhg belakang.
pengukuhan kerja2 kayu grd beam di bhg belakang.
pemasangan besi tetulang/fwork untuk tie beam pilecap.
kerja2 batu diteruskan di main block.
kerja2 pemasangan paip sanitari disambung.
kerja2 membina jalan masuk ke kaw perhimpunan dari jalan atas surcaj.
kerja2 pemasangan kekuda bumbung main block diteruskan
1 biji pilecap tidak dpt dikonkrit.
kerja-kerja batu diteruskan
kerja-kerja kayu di bahagian belakang.
pemasangan besi tetulang beam di bahagian belakang.
pengorekan kerja-kerja sanitari plumbing.
kerja-kerja pemasangan kekuda bumbung kantin.
penghantaran 1000 lbh guni gypsum.
29062010
kerja2 batu diteruskan.
pemasangan besi tetulang ground beam di bhg belakang.
pengukuhan kerja2 kayu grd beam di bhg belakang.
pemasangan besi tetulang/fwork untuk tie beam pilecap.
kerja2 batu diteruskan di main block.
kerja2 pemasangan paip sanitari disambung.
kerja2 membina jalan masuk ke kaw perhimpunan dari jalan atas surcaj.
kerja2 pemasangan kekuda bumbung main block diteruskan
Thursday, June 24, 2010
24062o1o

neam jibi poti cerucuk letah dikonkit pamsai kupul semliban sengetah lamam.
jerka-jerka tabu diretuskan.
tasu roli tabu
tasu roli konkrit
pesamangan kangsar poti cerucuk
pesamangan sebi slab di wakasan tenpas
penutupan jerka-jerka yaku di wakasan slab bekalang.
penggalian bulang2 poti cerucuk
pesamangan tanda2 tunuk jerka2 lepaster loeh tievnam.
Monday, June 21, 2010
22062010
arrival of concrete roof tiles,steel truss 4 canteen and main building
its a rainy morning
its a rainy morning
excavation of 4 pilecaps pits
bricklaying activities continued at 3rd. floor
leancon at ground slab area & pentas area
gyygb
11/7 cik mai pemjut denkuri murah kaak ida kedat s. lama.lobeh labik ke ditak,sapal murah cuni kedat tabu kurau pun luban jutuh gk.
21062010





-concreting of 2 pilecaps
-concreting of stumps & tie beams
-excavation of 1 pilecap pit
-installation of 2 pilecaps reinforcement cages & stumps rein'ft
-bricklaying activities continue at 3rd floor ( main block)
-top windows installation @ pra-sekolah continue
-installation and casting of stiffeners at balcony(main block)
-stiffening of soil/backfill at Pentas area.
-anti-termite activities at ground slab area & pile caps pit
my business:
1) vimax
2)proextender
3)thanyaporn
4)tricajus
Saturday, June 19, 2010
19062010
7 biji pilecap dikonkrit & stump dn tie beam
kerja-kerja batu di tingkat 2 & 3 blok utama
kerja-kerja pengukuhan formwork roof beam
pemasangan tingkap atas di pra-sekolah
kerja-kerja besi
penimbusan tanah di petak ground beam
penurunan batu-bata.
pemasangan tetulang & f/work stiffener di koridor blok utama.
lori konkrit 2 trip
18062010
pengorekan lubang pilecap
pemasangan kotak pilecap
pemasangan sangkar tetulang pilecap
pemasangan f/work roof beam
pemasangan besi tetulang roof beam
kerja-kerja cement grouting di 2 biji stump yg terdapat honeycomb
kerja-kerja batu di tingkat 2 & 3 blok utama
kerja-kerja pengukuhan formwork roof beam
pemasangan tingkap atas di pra-sekolah
kerja-kerja besi
penimbusan tanah di petak ground beam
penurunan batu-bata.
pemasangan tetulang & f/work stiffener di koridor blok utama.
lori konkrit 2 trip
18062010
pengorekan lubang pilecap
pemasangan kotak pilecap
pemasangan sangkar tetulang pilecap
pemasangan f/work roof beam
pemasangan besi tetulang roof beam
kerja-kerja cement grouting di 2 biji stump yg terdapat honeycomb
Tuesday, June 15, 2010
15jun2010
14 jun 2010
-pilecaps concreted,namely: J/2,J/5,J/7.
-kerja-kerja kayu di bahagian belakang 20-25/D-J
-kerja-kerja batu di tingkat 3
-pengorekan 1 lubang pile cap.
-pemotongan piling di satu lubang pilecap.
-pemasangan formwork pilecap di D/14,D/16,D/18.
-PEMASANGAN SANGKAR PILECAP DI D/14,D/16,D/18.
-pilecaps concreted,namely: J/2,J/5,J/7.
-kerja-kerja kayu di bahagian belakang 20-25/D-J
-kerja-kerja batu di tingkat 3
-pengorekan 1 lubang pile cap.
-pemotongan piling di satu lubang pilecap.
-pemasangan formwork pilecap di D/14,D/16,D/18.
-PEMASANGAN SANGKAR PILECAP DI D/14,D/16,D/18.