Wednesday, June 30, 2010

30062010

konkrit di kawasan slab belakang

konkrit d kawasan pentas

konkrit tie beam dn 1 biji pilecap yg tertinggal

Anas berjaya mengesan pilecap yg terdapat honeycomb.

kerja2 bata diteruskan di tingkat 1

kerja2 pemasangan frame tingkap di tingkat bawah

arrival of window frames 4 main block

kerja2 kayu bersebelahan bgn main block sblh tnb yg telah siap di konkrit

kerja2 pemasangan roof truss di roof beam kantin.

kerja2 pemasangan besi tetulang grd. beam bersebelahan slab yg dikonkrit.

Tuesday, June 29, 2010

28062010

empat biji pilecap dikonkrit.

1 biji pilecap tidak dpt dikonkrit.

kerja-kerja batu diteruskan

kerja-kerja kayu di bahagian belakang.

pemasangan besi tetulang beam di bahagian belakang.

pengorekan kerja-kerja sanitari plumbing.

kerja-kerja pemasangan kekuda bumbung kantin.



penghantaran 1000 lbh guni gypsum.




29062010

kerja2 batu diteruskan.

pemasangan besi tetulang ground beam di bhg belakang.

pengukuhan kerja2 kayu grd beam di bhg belakang.

pemasangan besi tetulang/fwork untuk tie beam pilecap.

kerja2 batu diteruskan di main block.

kerja2 pemasangan paip sanitari disambung.

kerja2 membina jalan masuk ke kaw perhimpunan dari jalan atas surcaj.

kerja2 pemasangan kekuda bumbung main block diteruskan

Thursday, June 24, 2010

24062o1o


neam jibi poti cerucuk letah dikonkit pamsai kupul semliban sengetah lamam.

jerka-jerka tabu diretuskan.

tasu roli tabu

tasu roli konkrit

pesamangan kangsar poti cerucuk

pesamangan sebi slab di wakasan tenpas

penutupan jerka-jerka yaku di wakasan slab bekalang.

penggalian bulang2 poti cerucuk

pesamangan tanda2 tunuk jerka2 lepaster loeh tievnam.

Monday, June 21, 2010

22062010

arrival of concrete roof tiles,steel truss 4 canteen and main building

its a rainy morning

excavation of 4 pilecaps pits

bricklaying activities continued at 3rd. floor

leancon at ground slab area & pentas area


gyygb

11/7 cik mai pemjut denkuri murah kaak ida kedat s. lama.lobeh labik ke ditak,sapal murah cuni kedat tabu kurau pun luban jutuh gk.

21062010






-concreting of 2 pilecaps

-concreting of stumps & tie beams

-excavation of 1 pilecap pit

-installation of 2 pilecaps reinforcement cages & stumps rein'ft

-bricklaying activities continue at 3rd floor ( main block)

-top windows installation @ pra-sekolah continue

-installation and casting of stiffeners at balcony(main block)

-stiffening of soil/backfill at Pentas area.

-anti-termite activities at ground slab area & pile caps pit


my business:

1) vimax
2)proextender
3)thanyaporn
4)tricajus

Saturday, June 19, 2010

19062010

7 biji pilecap dikonkrit & stump dn tie beam

kerja-kerja batu di tingkat 2 & 3 blok utama

kerja-kerja pengukuhan formwork roof beam

pemasangan tingkap atas di pra-sekolah

kerja-kerja besi

penimbusan tanah di petak ground beam

penurunan batu-bata.

pemasangan tetulang & f/work stiffener di koridor blok utama.

lori konkrit 2 trip





18062010

pengorekan lubang pilecap

pemasangan kotak pilecap

pemasangan sangkar tetulang pilecap

pemasangan f/work roof beam

pemasangan besi tetulang roof beam

kerja-kerja cement grouting di 2 biji stump yg terdapat honeycomb

Tuesday, June 15, 2010

15jun2010

14 jun 2010

-pilecaps concreted,namely: J/2,J/5,J/7.

-kerja-kerja kayu di bahagian belakang 20-25/D-J

-kerja-kerja batu di tingkat 3

-pengorekan 1 lubang pile cap.

-pemotongan piling di satu lubang pilecap.

-pemasangan formwork pilecap di D/14,D/16,D/18.

-PEMASANGAN SANGKAR PILECAP DI D/14,D/16,D/18.